一区二区免费看_激情一区二区三区成人_亚洲一区二区三区免费视频_69久久_国产三级理论_一本到在线观看视频不卡

Your Current Location :HomeNewsCompany News  ? Metal detector installation precautions

Service Hotline

+86 13711845437

Manager Zhang

Metal detector installation precautions

Source: Time:2022-08-08 15:35:20 views:

The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

1. Installation conditions of metal detector


Install this device in a location that meets the following conditions.

? Places where the temperature is not lower than 0°C and not higher than 40°C.

? Places with humidity in the range of 30~85% and no condensation.

? There is no direct sunlight, and there are no heating appliances such as stoves and heaters nearby.

? The fluctuation range of power supply voltage does not exceed ±5%.

? Away from vibration sources, places that are not prone to vibration.

? A place with less dust.

? Places without volatile flammables, corrosive gases and salt water.

? Places where the hot and cold air of the air conditioner does not blow directly against the equipment.



2. Precautions for installation of metal detector


The power supply should be a self-contained system and should be separated from the power supply system of noise-generating equipment and other devices (large motors, packaging machines, etc.). And it should be connected to an outlet closer to the power source.

Please do not wire in multiple directions. If a heavy object is placed on the power cord, it will crush the cord and cause a fire or electric shock.

The power cord should be kept away from heating appliances. Before unplugging the power plug, you should turn off the power switch and pull out by holding the plug.

When this equipment is connected (connected) to other equipment (front and rear conveyors, etc.), malfunction may occur. In this case, please do not connect with other equipment and ground it separately.



3. Adjustment of the plane height of the conveyor belt between the metal detector and the front and rear devices


Adjust the plane height between the equipment and the front and rear conveyor belts to the same level. There should be no gaps between the device's foot bolts and the ground to avoid shaking. After adjustment, the brake nut must be tightened with a wrench.



4. Connection of power supply and grounding of metal detector


To avoid danger, install a circuit breaker in the middle of the power supply to this equipment. Also, if it is used in a humid environment, an earth leakage circuit breaker should be installed.

To avoid electric shock and ensure stable operation of this equipment, the power plug must be grounded. (Use a soft copper wire with a diameter of 1.6mm or a metal wire with equivalent strength that is not easy to corrode. The grounding impedance must be less than 100 ohms.)
Links
主站蜘蛛池模板: 中文字幕在线免费 | 国产成人精品久久二区二区 | 99国产大尺度福利视频 | 久草资源在线观看 | 成人欧美视频在线看免费 | 在线观看a视频 | 333av| 亚洲精品一区二区 | 久久久高清 | 天天爽天天干 | 日韩在线高清视频 | 国产一区| 在线观看免费av网 | 国产一级片在线播放 | 日本黄色免费大片 | 亚洲精品动漫在线观看 | 亚洲日本中文字幕在线 | 奇米影视777最新在线 | 亚洲精品一二区 | 午夜视频网站 | 日韩一级| 日本欧美大码aⅴ在线播放 久久精品一区二区国产 | 欧美日韩专区 | 日韩av在线一区二区三区 | 色视频观看 | 亚洲欧美日韩成人一区在线 | WWW.久久爱.COM狼人 | 国产高清在线精品 | 精品国产乱码久久久久久丨区2区 | 欧美精品久久久 | pinsetang| 国产精品美女在线观看 | 午夜精品在线观看 | 久久久久久片 | 日日操网 | 婷婷成人丁香五月综合激情 | 一级欧美毛片成人 | 国产高清在线观看视频 | 亚洲欧美成人无码久久久 | 亚洲人成在线播放 | 欧美金8天国 |